What Pipe End / Bevel Preparation Is Required?

Short answer. Pipe ends are an engineering decision, not a packing detail. The end configuration controls field fit-up, how the internal lining is closed out, and how the girth weld is coated.

  • State butt-weld ends, flanges or other connections on the RFQ, together with the welding procedure.
  • Bevel geometry follows the approved WPS/PQR; do not leave it to the fabricator’s discretion.
  • Lining termination and pipe-end cutback length must match the chosen field joint system.
  • Pipe-end protectors for shipping are specified separately from the permanent end preparation.

AWWA C200 covers the pipe and C206 field welding; the approved WPS/PQR governs bevel preparation.

Because many Southeast Asian projects involve barge legs and a second lift, the permanent bevel also needs a shipping protector that can be removed without damaging the lining termination.

See our spiral welded steel pipe for the supply range. Send the pipe-end drawing and welding procedure and we will confirm what is executable in production. Send your enquiry.