Short answer. Force main coating is the corrosion-protection system on the inside and outside of a pressurized wastewater pipe. A force main runs full and under pressure, so both surfaces need a barrier: the outside against buried soil and groundwater, the inside against the sewage itself.
Why a force main is coated differently
A gravity sewer moves wastewater by slope and usually runs only partly full. A force main is pumped, stays full, and carries flow under pressure. That changes the coating job. Where sulphide builds up in the wastewater — and comes out of solution at drops, vents or downstream structures — bacterial oxidation can form sulphuric acid that attacks cement-based linings; specify an acid-resistant epoxy lining when that risk is present. Outside, the pipe is buried, so soil resistivity, groundwater and stray current set the external specification. In the enquiries we handle, buyers usually separate the two problems: an internal lining chosen for acid resistance, and an external coating chosen for the burial conditions.
What the coating system covers
- Internal lining. Liquid epoxy to AWWA C210 or fusion-bonded epoxy powder to AWWA C213 where sulphide acid is expected; cement mortar to AWWA C200/M11 for less aggressive flows.
- External coating. 3PE to AWWA C215, DIN 30670 or ISO 21809, or FBE, selected for soil and groundwater conditions.
- Field joints. The welded joint is coated on site with heat-shrink sleeve or liquid epoxy, then holiday-tested before backfill.
- Cathodic protection. Buried force mains are normally paired with CP; the coating lowers current demand.

Force main vs gravity main: coating requirements
| Item | Force main | Gravity main |
|---|---|---|
| Flow condition | Full, pressurised | Partly full, gravity flow |
| Internal threat | Dissolved H2S, sulphuric acid attack | Sulphide build-up possible; crown corrosion in the gas space |
| Typical internal lining | Epoxy (acid resistant) | Cement mortar common |
| External coating | 3PE or FBE plus cathodic protection | 3PE or FBE, CP as specified |
| Field joint + holiday test | Required on every welded joint | Required on every welded joint |