1 The project

Water supply for a remote copper-gold operation in Balochistan, at the Pakistan end of the China–Pakistan Economic Corridor: a large volume of buried pipe in one campaign, with a delivery window measured in weeks.
38,000+ m of DN600 spiral welded pipe in 9 m pieces, cement mortar lined inside and coal tar epoxy outside, under client-appointed whole-process supervision.
325 truckloads reached Tianjin Port within two months, peaking at 28 trucks a day. Deputy GM Wu Jianwei then led 40 days of after-sales support at the site.